I’m nonetheless specializing in my workshop and making an attempt to get some initiatives achieved exterior earlier than I flip my consideration to our bed room suite. I do know that in all probability doesn’t make sense within the minds of many individuals. In any case, we actually don’t have a bed room proper now. We’ve turned our breakfast room into a short lived bed room whereas the rooms that will likely be our bedrooms suite are beneath building.
So why am I specializing in my workshop? As a result of I wish to. 😀 That’s actually it. I’ve fairly the checklist of initiatives I wish to get achieved this yr (which you can see here), and I wished to leap in with each toes and get began on my checklist. And once I obtained began, the initiatives that I felt probably the most motivated and excited to do have been those on my workshop, particularly for the reason that climate was so lovely. And now that the workshop is underway, I’m tremendous motivated to see the outside completed.
We’ll see how far I can get earlier than the climate forces me inside. In any case, that is winter. And regardless that I’m in Texas, our climate can nonetheless get fairly chilly. I’m typically okay with chilly so long as there’s plenty of Texas sunshine, however it’s a tough “no” for me relating to chilly and windy, or chilly and moist. So I’m undecided how far I can get, however I’m going to do my greatest to really end it earlier than switching gears. I promise nothing, although. 😀 I’ll go the place my motivation takes me.
Anyway, simply as a fast overview, thus far I’ve turned this boring grey constructing…

After measuring the width of the area that I left open within the skirting to get the width of the steps (75″), after which measuring from the bottom to the underside of the metallic threshold on the workshop door to find out the general peak of the steps (15″), I sat down at my desk to provide you with my particular plan, actual measurements, and provide checklist. I do know that’s gained’t make any sense to y’all, however right here’s a glimpse of how I plan initiatives like this, and the way I determine my provide checklist.

My plan was to construct these steps straight on the bottom. That implies that I wanted to make use of stress handled wooden particularly marked for floor contact use. Remember that not all stress handled wooden is created equal. Additionally bear in mind that the staff at Lowe’s are in all probability going to be clueless about this. Those on the Waco retailer certain have been. I stored asking the place I may discover stress handled 2×6’s for floor contact, and all of them (three completely different staff) pointed me to the common stress handled lumber that’s particularly marked on the top with “not meant for floor contact.” This lumber is stress handled, and but, it shouldn’t be used any nearer than six inches from the bottom.

In case you’re going to place lumber straight on the bottom, you wish to search for stress handled lumber particularly marked for floor contact use.

They really didn’t have any floor contact 2×6’s, so I needed to go for 2×12’s as a substitute. That was wonderful as a result of I used to be going to have to tear the two×6’s to the fitting width anyway, and I can simply as simply rip 2×12’s. And since I used to be utilizing 2×12’s, I solely wanted half the quantity, so I believe I ended up saving just a few {dollars} in the long run. I additionally purchased PVC boards to clad the stress handled steps, cedar deck boards, 3.5-inch exterior screws particularly labeled to be used in stress handled lumber, a brand new round noticed blade, 5-inch HeadLOK screws to screw the steps to the constructing, deck screws, and mending plates.

The plan was to construct three frames, one for every of the three steps, and stack them. The underside body would have exterior dimensions of 75″ large (the width of the area within the skirting) by 54″ deep. However as a result of the lengthy back and front boards have been connected inside the 54-inch-long aspect boards, I minimize them three inches shorter. That manner, as soon as they have been all screwed collectively, the width of the board (72″) plus the thickness of the 54″ boards on both sides (1.5″ every) would whole the 75-inch width I wanted to suit contained in the opening within the skirting. After which I minimize the inner helps to 51″.

That 54-inch measurement will enable for a 30-inch-deep prime step/stoop, and 12 inches for the center and backside step, for a complete of three steps, every 5 inches excessive, to succeed in the 15 inches whole peak that I had from the bottom to the metallic threshold of the door.
To tear the two×12’s to the fitting peak, I used my round noticed with a rip fence connected. This is the exact circular saw I have (affiliate hyperlink), and it did a wonderful job and made very straightforward work of ripping this 2×12 lumber. And please take pleasure in this nonetheless shot from my video. I selected it particularly as a result of it made me chortle so laborious that I caught Tiger mid-jump. 😀

I additionally wish to level out that since I wished every step to be 5 inches, I ripped the boards for the underside body to 4″. Since this backside body could be sitting straight on the bottom, that 4″ peak plus the 1″ deck board would give me a peak of 5 inches for step one. However on the following two frames, I ripped the boards to five″ as a result of 1″ of that body could be misplaced behind the 1″ deck boards on the earlier step. Right here’s a side-view illustration to point out you what I imply.

With my boards ripped to the proper peak and size with the round noticed, I put them collectively utilizing the three.5″ exterior screws labeled to be used with stress handled wooden.

After which I added three inside helps for every body. I wished these spaced not more than 16″ aside, which is the spacing used for ground joists on a home. Mine ended up being spaced 15″ aside.

And I screwed these to the body utilizing two screws on both sides.

Right here’s what that first body regarded like in place sitting contained in the opening of the skirting.

I constructed the second body in the very same manner, however this one was 42″ deep to permit for a 12″ depth for step one.

After which the third one was the identical course of, however 30″ deep to permit a 12″ depth on the center step and a 30″ depth on the highest step/stoop.

After I tried to stack them the primary time, I spotted that I had gotten forward of myself. Earlier than the three packing containers could possibly be stacked and secured to one another and to the constructing, I wanted to chop away and take away the entire trim boards that have been under the metallic threshold. I used a scrap piece of lumber as a straight edge, lined up beneath the brink, to attract a line the place I wanted to chop the aspect door casing boards, after which used my Dremel Multimax (affiliate hyperlink) to chop and take away the boards.

With these trim items gone, that allowed the packing containers to stack correctly proper towards the constructing.

And you’ll see right here the way it sat flush towards the siding with the trim items eliminated.

Then I had one other drawback, however it was one which I had been anticipating. The bottom wasn’t completely degree (surprising! 😀 ), and I wanted to make use of my shovel to do some leveling in order that the deck board would sit slightly below the metallic threshold. You possibly can see under that with out leveling out the bottom, the deck board didn’t match correctly beneath the brink.

And the entire construction was barely unlevel — larger on the left aspect and decrease on the fitting aspect.

Right here’s a greater view of what I used to be beginning with.

Earlier than I moved issues round and began digging within the grime, I made a decision to go forward and fix the frames to one another. I used these mending plates to do this.

These plates are extremely sharp, and they’re typically used for holding lumber collectively to kind trusses and issues like that. They’re typically connected utilizing a hydraulic press, however you may also connect them utilizing a hammer. It gained’t be as fairly and excellent as these connected with a hydraulic press, however it’ll do the job. I used my 3-pound hammer to connect these, and it made the job fast and simple. I used a complete of 14 mending plates to carry the frames collectively.

With the entire construction put collectively, I used to be then in a position to dig out the grime till I had the left aspect low sufficient to suit a deck board between it and the brink.

And I additionally had the entire thing fairly near degree.

After I put the deck board on to check for match, the fitting aspect was about 1/4″ too low, so I used 8″ composite shims (as a substitute of wooden shims, which might rot towards the bottom) to shim up the fitting aspect till it was degree. These elements of the shims which can be protruding might be minimize away, or they’ll simply be hidden with mulch.

As soon as the fitting aspect was shimmed, it was as near completely degree as I used to be going to get it.

As soon as the construction was in place and degree, I used these 5-inch LedgerLOK screws to safe the steps to the constructing.

Right here’s an in depth up have a look at the LedgerLOK screw. These items are huge and robust. There’s no manner my steps will likely be shifting with these holding them in place.

I used 4 whole, one in every part of the body, to safe the steps to the constructing.

After which I used to be lastly prepared to connect the deck boards. I minimize the deck boards to the width of the body plus 5 inches for a 2.5″ overhang on both sides. As soon as the beautiful PVC boards are connected, that can give me a completed overhang of 1.5″ on both sides. I began with the entrance board (i.e., the board furthest away from the constructing) and I connected it with a 1.75″ overhang on the entrance of the step. Once more, as soon as the PVC boards are connected, that can give me a closing overhang on the entrance of three/4″. After which I labored my manner again in the direction of the constructing.

Right here’s a have a look at the progress with the primary 4 boards connected. (Sorry for my finger! I don’t know what occurred there. 😀 )

The ultimate board needed to be ripped to a narrower width to suit. I used my round noticed with the rip fence to chop that board, after which slid it in beneath the metallic threshold.

And right here’s the highest step achieved!

I repeated that on the opposite two steps, once more beginning with the boards closest to the entrance of the steps (i.e., furthest away from the constructing) and labored my manner again. These steps additionally required the ultimate boards to be ripped to a narrower width.

And right here’s the fundamental construction completed!


I’ve no plans so as to add handrails to those steps. They’re very brief steps and solely whole 15″ in peak, so at the least for now, I see no want in having a hand rail. If somebody with mobility points needs to enter my workshop, they’ll accomplish that very simply utilizing the aspect ramp.

That’s the place I had deliberate to cease for the day, however I made a decision to go forward and get one coat of stain on the steps earlier than calling it quits for the night. That manner, the stain would have loads of time to dry earlier than I added the beautiful PVC boards. I actually didn’t wish to get stain on these PVC boards. I used to be just about working in the dead of night to get that coat of stain on, so I needed to do some photograph enhancing magic to brighten up this image sufficient to point out the steps as soon as I completed the staining course of. The colours undoubtedly aren’t correct. I used Cabot Australian Timber Oil, and I can’t keep in mind the colour. This isn’t the ultimate coloration I need, so the steps will want a second coat of a unique coloration.

So all that’s left after that is to clad the frames with the PVC boards to make them seem like our entrance steps. Keep tuned for the ultimate workshop steps!
If you wish to sustain with my 2025 checklist of dwelling objectives (and my progress with hyperlinks to completed initiatives!) you may see that right here: 2025 Master List of Home Goals
Addicted 2 Adorning is the place I share my DIY and adorning journey as I transform and enhance the 1948 fixer higher that my husband, Matt, and I purchased in 2013. Matt has M.S. and is unable to do bodily work, so I do the vast majority of the work on the home on my own. You can learn more about me here.