Y’all, I appear to have the worst success in making an attempt to rent out work on our home. I hold making an attempt, however thinks simply by no means appear to fairly work out for me. 😀
Tuesday morning, I acquired up figuring out that I had an enormous activity forward of me — putting in the hardwood flooring in our master suite suite. There are two rooms and a lobby that solely have plywood subfloor at this level, so that they want hardwood flooring. I’ve put in loads of hardwood flooring up to now, so I do know I can do it. I’m succesful. I’ve the instruments. However what I lacked was the drive and motivation to get it achieved. It’s only a complete lot of flooring, and the duty appeared fairly formidable to me.
I used to be additionally feeling very uncertain in regards to the course of for a cause I’ll clarify later on this publish. And since I used to be having large doubts in regards to the course of, I used to be feeling so unmotivated to leap in and get the mission achieved. These doubts have been nagging at me for weeks now, and regardless of how a lot I attempted, I couldn’t discover the reply to my query in regards to the set up course of. However extra on that in a minute.
So I made a decision that this may be the right mission to rent out. After trying on-line at native firms and their Google scores and opinions, I selected an organization. Waco isn’t that large, so in the case of firms that can simply set up flooring (relatively than making an attempt to promote me flooring and having their individuals set up the flooring that I purchase from them), I actually solely discovered one firm that might do it. Fortunately, that firm has unbelievable opinions. So I known as, and the person got here out that day (Tuesday) to measure for an estimate. He mentioned he would get again to me that afternoon with the estimate. Sadly, I nonetheless haven’t heard again from them.
I’m actually okay with it, although. The principle half that I wished to rent out is the sanding. Putting in the flooring is the simple half. The half I dread probably the most is the sanding. However I used to be informed that they solely do the set up, and I’d have to seek out another person to do the sanding and the ending (or do it myself) as a result of they don’t do this. I used to be so disillusioned to study that. To me, it doesn’t actually appear price it to rent out a job after they’ll solely do the simple half, however I’m nonetheless caught doing the toughest half.
So in the long run, I’m actually not even upset about the truth that they didn’t get again to me with an estimate. If they’ll’t do the half I dread probably the most, and I’d nonetheless be caught doing that half, I would as nicely do all of it myself. So right now is the day. Right this moment is formally flooring day.
There’s lots of flooring to be put in, and it’s really easy to get overwhelmed at having to do all of this myself from begin to end.

However I’m simply going to take it one step at a time. Because the saying goes, how do you eat an elephant? One chew at a time. That is my elephant. 😀

I don’t know how lengthy this may take, however I’m going to do my greatest to not drag this out. I’m able to get to the enjoyable stuff. However once more, I’ve two rooms and a lobby that want flooring.

However the flooring goes to utterly change the look of this complete space. That motivates me!

The benefit of having him come out is that I used to be in a position to ask that query that has been nagging at me and preserving me from leaping into this flooring mission prior to now. And that query was about underlayment/moisture barrier.
The unique hardwood flooring in our home has/had felt paper between the hardwood flooring and the subfloor to behave as a barrier. That’s mainly the stuff that’s used underneath shingles on a roof. So a number of weeks in the past once I began putting in the flooring, I began laying down the felt paper. Chances are you’ll recall seeing that in photos of the lobby from a number of weeks in the past.

However then I took that felt paper up and puzzled if I wanted to bypass that step as a result of I remembered that in all of this space that has new subfloor, the contractor added Tyvek underneath the ground joists, after which added insulation between the ground joists, earlier than putting in then new subfloor. They did that on our rest room ground two years in the past once I employed that authentic contractor to do the work, and he defined that town now requires that on any remodels coping with the subfloor. So once we had the subfloor changed in these areas, they did that in these areas as nicely.
So my greatest concern was that by including a layer of felt paper between the subfloor and hardwood flooring, I could also be creating that dreaded “moisture barrier sandwich” that may trigger large issues. Are y’all conscious of the “moisture barrier sandwich” problem?
I discovered about this a few years in the past, again in 2014, once I was reworking our hallway rest room. I used to be able to do the bath encompass, and I used to be researching one of the simplest ways to waterproof a bathe/bathtub encompass. I discovered that there are two major methods to do it.
The primary manner is to connect thick plastic sheeting to the wall studs and ensure the plastic sheeting utterly seals the world. After which on high of the sheeting, set up the concrete board, sealing the seams and the screw holes. After which tile immediately on high of the concrete board.
The second major strategy to do it’s to put in the concrete board on to the wall studs and seal the seams and screw holes. After which use a paint-on waterproofing barrier like RedGard or SEMCO Liquid Membrane (my favourite waterproofing membrane) on high of the concrete board. As soon as that’s dry, you then tile on high of the waterproofing membrane.
When doing the hallway rest room bathtub encompass, I selected the RedGard liquid waterproofing membrane possibility.

However the secret’s which you can solely select one possibility. You may’t do each. Waterproofing isn’t a kind of conditions the place one possibility have to be good, so utilizing each choices have to be higher. As a result of in case you do each — use the plastic sheeting on the studs PLUS add a waterproofing membrane to the concrete board — you’ve created that dreaded “moisture barrier sandwich”, which signifies that in case you occur to have a failure someplace in that waterproofing membrane, and water occurs to get behind the concrete board, it’s caught there and has no strategy to evaporate as a result of it’s caught between the waterproofing membrane and the plastic. After which what you’ve created is the right breeding floor for mildew. So in the case of bathe surrounds, you solely ever waterproof behind the concrete board or on high of the concrete board, however by no means each.
So this one problem has been nagging me for weeks now. If I’ve Tyvek underneath my ground joists, plus felt paper on high of the subfloor, is that making a moisture barrier sandwich? I’ve googled each search time period I may consider to reply my query of whether or not or not I ought to use felt paper above the subfloor on this state of affairs, however it doesn’t matter what I searched, I couldn’t discover the reply. And I used to be so afraid to maneuver ahead with out figuring out with full confidence if I used to be about to make an enormous mistake by utilizing the felt paper.
So when this man — the proprietor of this decades-old flooring set up firm — was right here, I defined the state of affairs very clearly, and he repeated it again to me greater than as soon as, so I do know he understood precisely what I used to be describing. And since his enterprise is right here in Waco the place town now requires the Tyvek underneath the ground joists, I’m assured that he has seen this many occasions. So I requested him how they’d deal with that. Would they set up the hardwood flooring immediately on the subfloor? Or would they set up an underlayment of some kind between the subfloor and hardwood flooring?
He mentioned, “Oh, we might use an underlayment. We’d use one thing like…”, after which he stopped, regarded across the room, noticed my roll of felt paper leaning in opposition to the wall, and pointed to it and mentioned, “…that! We’d put that down first.”
So I’ve heard it immediately from the native skilled who’s been within the enterprise for many years. I breathed such a sigh of aid simply having that info confirmed by him. It was so price laying aside beginning on the flooring for 2 days simply to have that info from him and the peace of thoughts it brings figuring out that I can transfer ahead with full confidence that I’ll be putting in the flooring precisely like an area skilled with many years of expertise on this space would have achieved it.
And now with that confidence and that peace of thoughts, I can get busy on the flooring. I’d nonetheless love for another person to do the sanding for me, but when I can’t discover anybody, I’m high-quality with doing it myself. I dread it, and it’s one in every of my least favourite issues to do, however at the very least I’ve expertise. 😀 It received’t be my first time, and it most likely received’t be my final, both.
Trending Merchandise